In mid-April 2023, construction will begin on Moraine Park’s Beaver Dam Campus to update the student services area and a portion of the health and human services space. The construction will run through summer 2023. During this time, the main entrance (K1) will not be accessible.
The construction is part of two separate projects occurring simultaneously: Student Services Remodel and the Science and Certified Nursing Assistant (CNA) Lab Remodel.
Student Services Remodel – $1,500,000
This remodel will move Student Services closer to the main entrance, creating a more efficient and effective student service experience. The existing spaces will be reallocated back to instructional spaces.
This remodel also provides needed updates to general education classrooms and includes the installation of a wet fire sprinkler system to the remaining non-covered portion of campus.
Science and CNA Lab Remodel – $250,000
The science and CNA lab remodel will update the science lab and preparation room that are utilized by many programs, as well as the CNA classroom/lab. The labs will update to meet new program requirements and match the finishes of the surrounding health and human services spaces that were completed in 2020.
Other Facility Projects